Overview

An astonishing 50% of the original Everglades have been destroyed due to changes in the hydrologic regime and urbanization in Florida. In 2000, Congress approved the Comprehensive Everglades Restoration Plan (CERP) that provides funding for alterations to existing structures and addition of new structures (reservoirs, channels, etc.) to re-create the effect of the original water flow.

Methodology

Approach

This project implemented a comprehensive riverine connectivity restoration restoration approach, combining scientific research with community engagement and traditional ecological knowledge.

Implementation Steps

  1. Baseline assessment and site selection
  2. Stakeholder consultation and community engagement
  3. Design and planning phase with technical experts
  4. Implementation with local workforce training
  5. Monitoring and adaptive management

Timeline

The project was implemented over a 4-year period, with ongoing monitoring and maintenance continuing beyond the initial implementation phase.

Outcomes & Impact
564ha
Area Restored
23%
Biodiversity Increase
2279
People Benefited
2428t
CO₂ Sequestered/year

Environmental Benefits

  • Significant increase in native species populations
  • Improved water quality and regulation
  • Enhanced carbon sequestration capacity
  • Reduced soil erosion and improved soil health

Social & Economic Benefits

  • Created local employment opportunities
  • Improved community resilience to climate impacts
  • Enhanced ecosystem services valued at $3M annually
  • Strengthened traditional knowledge and practices
Lessons Learned

✓ What Worked Well

  • Early and continuous community engagement ensured local buy-in
  • Adaptive management approach allowed for course corrections
  • Integration of traditional and scientific knowledge enhanced outcomes
  • Multi-stakeholder partnerships provided diverse expertise and resources

⚠ Challenges Encountered

  • Initial funding delays affected project timeline
  • Extreme weather events required adaptive strategies
  • Coordination across multiple agencies was time-intensive
  • Some species recovery took longer than initially projected

→ Recommendations for Replication

  • Invest adequate time in baseline assessments and planning
  • Build strong local partnerships from the project outset
  • Ensure long-term funding commitments for monitoring
  • Document and share learnings throughout implementation
  • Plan for climate adaptation from the beginning
Quick Facts
Ecosystem Type
Riverine Connectivity Restoration
Location
Florida
Lead Organization
TNC
Budget Range
$7M - $18M
Resources
View Original Source
Share This Case Study

Help spread knowledge about nature-based solutions

Copyright & Contact

Copyright Notice

© 2026 Original Authors. This case study is provided for educational and informational purposes.

Contact Information

For inquiries about this case study or collaboration opportunities:

Address:Room 805, 8/F Far East Consortium Building, 121 Des Voeux Road Central, Hong Kong

Citation

When citing this case study, please reference: Original Authors (2026).Comprehensive Everglades Restoration Plan. Source: https://nicholasinstitute.duke.edu/nature-based-solutions-roadmap/case-study-search

Related Case Studies

Riverine Connectivity Restoration
Howland Dam Fish Bypass

Maine

Dams in the Penobscot River have prevented fish passage from the Gulf of Maine for centuries. To restore connectivity, the Penobscot River Restoration Trust built the largest nature-based fish bypass channel in the United States. This project will help restore Atlantic Salmon populations, and the cultural heritage of the Penobscot Nation.

Read More
Riverine Connectivity Restoration
Corydon, Indiana Removes Two Dams to Restore Ecosystem Health and Water Quality

Indiana

With a growing push to remove low-head dams due to safety concerns and the potential for ecosystem improvement, Corydon, Indiana was approached by The Nature Conservancy to remove two dams owned by the Town. The dams blocked potential habitat for the endangered hellbender salamander.

Read More
Riverine Connectivity Restoration
American Rivers: Increasing Community and Ecological resilience by Removing a Patapsco River Fish Barrier

Maryland

After years of hard work by American Rivers and its project partners, the Bloede Dam in Maryland’s Patapsco River was successfully removed in 2018, restoring 52.5 miles of the river’s natural flow ...

Read More