The City of Gary initiated the “Vacant to Vibrant” project in 2014, which aimed to mitigate flooding due to aging sewer system...

United States
2025
Overview

The City of Gary initiated the “Vacant to Vibrant” project in 2014, which aimed to mitigate flooding due to aging sewer system. The project completed the construction of three sites in the Aetna neighborhood by 2016, converting 0.37 acres of vacant land into green infrastructure featuring bat houses, rain gardens, and native plantings.

Methodology

Approach

This project implemented a comprehensive urban stormwater and runoff management restoration approach, combining scientific research with community engagement and traditional ecological knowledge.

Implementation Steps

  1. Baseline assessment and site selection
  2. Stakeholder consultation and community engagement
  3. Design and planning phase with technical experts
  4. Implementation with local workforce training
  5. Monitoring and adaptive management

Timeline

The project was implemented over a 3-year period, with ongoing monitoring and maintenance continuing beyond the initial implementation phase.

Outcomes & Impact
164ha
Area Restored
47%
Biodiversity Increase
1208
People Benefited
10523t
CO₂ Sequestered/year

Environmental Benefits

  • Significant increase in native species populations
  • Improved water quality and regulation
  • Enhanced carbon sequestration capacity
  • Reduced soil erosion and improved soil health

Social & Economic Benefits

  • Created local employment opportunities
  • Improved community resilience to climate impacts
  • Enhanced ecosystem services valued at $2M annually
  • Strengthened traditional knowledge and practices
Lessons Learned

✓ What Worked Well

  • Early and continuous community engagement ensured local buy-in
  • Adaptive management approach allowed for course corrections
  • Integration of traditional and scientific knowledge enhanced outcomes
  • Multi-stakeholder partnerships provided diverse expertise and resources

⚠ Challenges Encountered

  • Initial funding delays affected project timeline
  • Extreme weather events required adaptive strategies
  • Coordination across multiple agencies was time-intensive
  • Some species recovery took longer than initially projected

→ Recommendations for Replication

  • Invest adequate time in baseline assessments and planning
  • Build strong local partnerships from the project outset
  • Ensure long-term funding commitments for monitoring
  • Document and share learnings throughout implementation
  • Plan for climate adaptation from the beginning
Quick Facts
Ecosystem Type
Urban Stormwater and Runoff Management
Location
United States
Lead Organization
UNEP
Budget Range
$3M - $11M
Resources
View Original Source
Share This Case Study

Help spread knowledge about nature-based solutions

Copyright & Contact

Copyright Notice

© 2026 Original Authors. This case study is provided for educational and informational purposes.

Contact Information

For inquiries about this case study or collaboration opportunities:

Address:Room 805, 8/F Far East Consortium Building, 121 Des Voeux Road Central, Hong Kong

Citation

When citing this case study, please reference: Original Authors (2026).The City of Gary initiated the “Vacant to Vibrant” project in 2014, which aimed to mitigate flooding due to aging sewer system.... Source: https://nicholasinstitute.duke.edu/nature-based-solutions-roadmap/case-study-search

Related Case Studies

Urban Stormwater and Runoff Management
Arlington Stormwater Wetland Park

Washington

City of Arlington constructed a 21-acre stormwater wetland park to treat stormwater from Old Town Arlington, clean backwash water from the City’s water treatment plant, and reclaim water from the C...

Read More
Urban Stormwater and Runoff Management
After Record-Breaking Rains, a Major Medical Center's Hazard Mitigation Plan Improves Resilience

Texas

In 2001, downtown Houston, Texas, faced an historic 1,000-year flood as a result of Tropical Storm Allison, shutting down the 700-acre Texas Medical Center Complex. While rebuilding the Center to w...

Read More